One question per page, answered in the first paragraph. These are the questions that decide a window package — schedule, energy compliance, hurricane approvals, documentation — and each answer is built from the same data the product pages publish, so it cannot drift away from them.

How long do imported aluminum windows take to arrive in the US?

A standard configuration is completed in 18 days in the factory. Ocean freight then adds about 35 days to the US West Coast or about 45 days to the East Coast, so plan on roughly eight to nine weeks from factory start to port. Special configurations take three to five weeks in production instead of 18 days.

Full answer

What U-factor do I need for my climate zone?

ENERGY STAR's residential window thresholds are a U-factor of 0.22 or lower in the Northern zone, 0.25 or lower in North-Central, 0.28 or lower in South-Central and 0.32 or lower in the Southern zone, in Btu/h·ft²·°F. Air leakage must be 0.3 cfm/ft² or lower in every zone. Your local energy code may be stricter.

Full answer

What is a thermal break, and does it matter?

A thermal break splits an aluminum frame into separate inner and outer sections joined by a rigid polyamide strut, so heat cannot conduct straight through the wall. It matters: aluminum conducts heat around a thousand times better than the insulating glass it holds, and an unbroken frame runs cold enough to condense indoor air.

Full answer

Tilt and turn or casement: which should I specify for a US project?

Specify tilt and turn where the outside is tight — walkways, balconies, narrow setbacks — or above the ground floor, where turning the sash inward lets you clean the outer face from the room. Specify casement where blinds, shutters, seats or worktops occupy the reveal, or where a crank is what US owners expect.

Full answer

What does NFRC certification actually tell me?

It tells you the whole product — frame and glass together — was measured by an accredited laboratory under one standard procedure, and that the result is published in the NFRC Certified Products Directory under a CPD number. It is not a centre-of-glass figure, and it is not an ENERGY STAR award.

Full answer

Can imported windows meet Florida HVHZ requirements?

Our impact line is tested to Miami-Dade County NOA standards under TAS 201, TAS 202 and TAS 203, per the Florida Building Code 8th edition (2023), at Zone 4 missile level D. It does not hold a Miami-Dade NOA number. Approval is granted jurisdiction by jurisdiction and confirmed in writing.

Full answer

What documentation should a window supplier give me?

Ask for the NFRC CPD number for every rated unit, the whole-window U-factor and SHGC behind it, shop drawings and a CAD schedule at quotation, the impact test protocols where relevant, the written warranty with its exclusions, and a packing list keyed to the unit ID tags. Anything missing is a question.

Full answer

Can a large window opening ship as one assembly?

Yes. Multi-unit combinations are joined in the factory and delivered as a single assembly, so a wide opening arrives complete rather than as parts to align on site. The joining mullion is 1 1/8 inches (28 mm) at every height grade up to 13 feet; only the internal reinforcement changes.

Full answer

Still the wrong question for your project?