UPVC Fixed Window
A fixed, non-operable UPVC window for openings that do not need ventilation — the picture window beside a door, the tall lite in a stairwell. UPVC gives up nothing to aluminum here: this line’s best certified U-factor (0.14) is the lowest of any system in the catalogue, aluminum included. Frame depth, maximum size, finish and glazing build-up are confirmed at quotation.
Configure your unit, then request a quote — we price it and reply, usually within one business day.
Every unit is made to the opening. Sizes confirmed at quotation.
Low-E1 / E2 / E3 coatings, laminated and tempered build-ups available. We recommend the coating for your climate zone.
No surcharge for any of these European hardware brands.
No price is shown because every unit is made to order. You will get a written quote for exactly this configuration.
Overview
A fixed, non-operable UPVC window for openings that do not need ventilation — the picture window beside a door, the tall lite in a stairwell. UPVC gives up nothing to aluminum here: this line’s best certified U-factor (0.14) is the lowest of any system in the catalogue, aluminum included. Frame depth, maximum size, finish and glazing build-up are confirmed at quotation.
| Product line | Essential |
|---|---|
| Material | UPVC |
| Type | Window |
| U-Factor | 0.20 Btu/h·ft²·°FNFRC CPD SHN-M-24 |
| SHGC | 0.19NFRC CPD SHN-M-24 |
| Lead Time | 9–10 weeks, fully door-to-door |
Specifications
| Material | UPVC |
Frame profile & section

Values not listed are pending the manufacturer’s certified test report and are deliberately left blank rather than estimated.
Mounting and frame options
The frame type decides the rough-opening detail, the flashing and how much of the existing wall has to come out. Four are available; tell us the wall build-up and we will specify which one your opening needs.
The standard new-construction frame. The flange laps the sheathing so the unit sets and seals in one operation.
A 1 3/8" flange is available where the cladding build-up needs the extra reach.
Installs over an existing aluminum window frame, so the stucco exterior is left intact. No cutting back and repatching.
Available on selected window types — ask us which of your openings can take it before you price the stucco work.
For full removal, when the existing frame is rotten or damaged and has to come out entirely.
Sets into the existing rough opening, and arrives with the through-the-jamb holes pre-drilled and the screws supplied.
Straps fix to the frame, which lets the unit sit anywhere in the depth of the wall cavity rather than at a fixed setback.
Installs from the interior, and works for both new construction and replacement.
Full CAD details for any of these are available on request for your wall assembly.
Factory-joined combinations for large openings
Multi-unit combinations are joined in the factory and delivered as one assembly, so the joint is made under shop conditions instead of on a scaffold. The joining mullion is 1 1/8" (28 mm) wide and comes in three reinforcement grades, chosen by the height of the window it has to carry. The system is covered by a US patent.
| Suggested window height | Joint width |
|---|---|
| up to 9 ft | 1 1/8" (28 mm) |
| 9 to 11 ft | 1 1/8" (28 mm) |
| 11 to 13 ft | 1 1/8" (28 mm) |
Combinations arrive partly or fully assembled depending on size and shipping method. Tell us the opening and we will confirm which grade your height needs and how the unit will be split for transport, before you price the crane time.
How large combinations are joined →Installation details




Timber frame, masonry and board substrates, plus the splice joint used to ship large units in sections. Full CAD details on request.
Installation methods explained →Performance & Certifications
NFRC certified performance
Certified figures from the NFRC Certified Products Directory — the source a U.S. building department will check. This window is certified separately as a fixed lite and as an operable lite, so both are shown: the operable sash carries the hardware and the operating joint, which costs a little thermal performance.
| Picture / fixed windowNFRC CPD: SHN-M-24verifiable at nfrc.org | |
|---|---|
| Double-pane | U 0.20 SHGC 0.19 · VT 0.44 · CR 48 |
| Triple-pane | U 0.14 SHGC 0.16 · VT 0.31 · CR 63 |
The CPD number is this product’s listing in the NFRC Certified Products Directory. You can verify it yourself at nfrc.org — search the directory for the number shown.Each figure is the best certified U-Factor for that combination, shown with the SHGC, VT and CR from that same certified line. Full certified range:Picture / fixed window: 53 certified glazing configurations · U 0.14–0.41
Values not listed are pending the manufacturer’s certified test report and are deliberately left blank rather than estimated.
Warranty
Our products are certified to:
Certificate numbers available on request.
VERIFIABLE NOW44 certified product linesListed in the public NFRC directory. Ask for the CPD number covering the system you are specifying and we will confirm it in writing.






Options
Finishes
Powder-coat finishes to the standard RAL card, plus anodized options. Wood interiors are available in several species and interior finishes.
Glazing
- Double- or triple-pane insulated glass
- Low-E1 / Low-E2 / Low-E3 coatings
- Argon fill
- Tempered and laminated build-ups
- Custom interlayer colours and patterns
Exterior finish
The exterior is extruded aluminum cladding, which is why the finish schedule matters more here than the colour chart on a vinyl window: it is a powder coat on structural extrusion, not a surface tint.
19 finishes are available in total, including three pearlescent. Twelve are named here; ask us for the rest, or for a custom colour match.
Swatches are indicative only — reproduced from print, shown on your screen. Specify by RAL number, and ask us for a physical sample before you commit an elevation to a colour.


Lead Time
- 9–10 weeks total, door-to-door: production, customs clearance, duties and delivery to your jobsite — nothing left for you to arrange separately.
- Ocean freight and drayage are booked and tracked on your order, not quoted as a separate step afterward.
- Shop drawings and a confirmed production schedule are provided before deposit, so the 9–10 weeks starts from a real date.
- Schedules are confirmed in writing at order. We build to your project timeline.
Downloads
Drawings & documentation
CAD window and door schedules, BIM models, performance documentation and installation details are prepared per project for trade accounts.
Request documentation →From our projects
Read all reviews →Customer statements from installed projects, quoted unedited.
“The windows have been a really positive experience. We like them a lot, And they seem really well made.”
“The windows are exactly what I am looking for and the quality is more than perfect. Thanks for your help.”
“Your windows are with very good quality and nice looking, and over all it is a great investment for us, thank you very much for your support.”
“Everything has been great so far! The team has had no issues installing which has allowed us to be ahead of schedule.”
You may also like
All NexWD Products Include Our Complete Standard Service Package.
- 9–10 weeks, fully door-to-door — production, customs, duties & delivery to your jobsite all included.
- Full North American certification support: NFRC, AAMA/WDMA/CSA 101 and Impact-line TAS documentation on request.
- Complimentary 10-year limited warranty; optional 20-year transferable glass coverage upgrade available.
- Free CAD/BIM technical files, direct from the factory — no dealer paywall.
- Zero extra charge for non-standard sizes and configurations.
- On-site technical support within 48 hours upon special service requests, across 39 states.



